GLP

Location: Lelystad
Target audience: Developers, Contractors
Target audience: Developers, Contractors
Client: VDR Bouwgroep
Construction period: Q1 2025
This construction project has been realized with limited CO2 emissions, partly due to the use of sustainable materials and products.
Greymatter concrete floors have been used, with 30% of the floor consisting of circular raw materials. Gravel has been replaced with circular materials, limestone powder substitutes part of the cement, and steel fibers are used instead of traditional reinforcement steel. As a result, CO2 emissions have already been reduced by 50%.
41,998 m²
Surface area
DIN 15185
Flatness
Circular
concrete



“The Greymatter technology helps achieve CO2 savings up to 50%”
Projects
View all projects
Vlissingen
V-Port Logistic Campus 21

Hoofddorp
Segro Park Amsterdam Airport

Lelystad
LCW Bestseller

Etten-Leur
Distribution center ProDelta

Helsingor
Verdion

What can we do for you?
Do you have a question or would you like more information? Our specialists are ready to help you. Please feel free to contact us.
Michiel van Zon
Technical Commercial Advisor